JEREMY S.

Posters for Fall 22 and Spring 23

Despite the website being down for half of this academic year, much progress was made on my project this year. Click the icon to read the posters for the WISRD Physiology Group this year, as well as posters from past years.

Journal entries imported from the previous iteration of wisrd.org

JEREMY S.

For regular progress updates on my current project, please go to the GEOFF page.

January 30, 2019:

Soldering on one of the boards for GEOFF is near completion. I did a majority of the soldering during my class period. There were many challenges during the soldering process as two separate teams did work on it at separate times. I learned about collaborating and coordinating separate teams, and developed strategies for staying organized. I also learned a lot about electronics, a subject I wanted to delve more into. I learned how to solder, the basic principles of computer hardware and PCBs, and about electronics in general.

December 13, 2018:

This past week I have been counting the circuit board parts that GEOFF needs for its PCBs. Here are the components we are missing:

1x DHT22 Temperature and Humidity Sensor
1x DC/DC Voltage Regulator, 5V 1A
1x DC/DC Voltage Regulator, 9V 1A
2x 10µF ±10% 50V Ceramic Capacitor X7S Radial
2x 33µH Unshielded Wirewound Inductor 1.9A 220 mOhm Max Axial
2x 22µF ±20% 16V Ceramic Capacitor X7R Radial
1x TVS Zener Diode 12V 17.1V 1.5KE
1x Green 527nm LED Indication – Discrete 3.4V Radial
6x 2 (1 x 2) Position Shunt Connector Black Open Top 0.100″ (2.54mm) Gold
1x 3 DS18B20 Temperature Sensors

December 10, 2018:

My and a few other GEOFF member’s White Papers were uploaded today. They provide more insight into the GEOFF and PANOPTES projects and can be found here.

November 14, 2018:

Checked build guides for grammar errors. Work on the GEOFF telescope is still waiting for the arrival of the PCBs and other building materials.

November 12, 2018:

Edited whitepapers by other GEOFF team members.

November 5, 2018:

Helped setup GEOFF for poster presentation.

October 31, 2018:

Designed O-ring to be laser cut that will protect camera lenses from the weather.

October 29, 2018:

Prepared for Dark Matter Day on 10/30/18 and reflected on my year so far.

October 24, 2018:

Added safety tape around aluminum weatherproofing shields in order to prevent injury when working around GEOFF. Continued work on the poster.


October 22, 2018:

Worked on the poster that will be shown at the WISRD poster presentation on November 5th. Still waiting on tape to complete safety of weatherproofing.

October 18, 2018:

Attached 3D Printed triangle to mount with silicone sealing.